Projects (30)

CPOTitleCompletion DateDescription
CPO 63Lighthouse09/30/2026Fabricate a buoy to house a GPS and radio to control UAS systems from underwater. The buoy must include a retractable system (reel) and should telescope for additional height to extend the antenna at the surface.
CPO 77DCS Trans. Modification Feasibility Study06/15/2026This purpose of this project is for Myco Trailers to conduct a feasibility study on the DCS Transporter to determine if the transporter can accommodate and be modified to allow for additional items on the forward top of the DCS Transporter.
CPO 83PICASSO - BCubed03/10/2026The purpose of the effort is to install and demonstrate an end-to-end R waveform capability at Alternative Waveform Manager (AWM) GAMBIT Ground Site(s). Under PICASSO, BCubed shall focus R waveform integration and installation efforts into SPECTRA and AWM GAMBIT and overall align with command and control through the STOIC WARRIOR framework.
CPO 88NYX Mission Planning Tool03/02/2026This project conducts an engineering and analysis effort to assess USSOCOM’s Next Generation Mission Planning (NGMP) platform for maritime mission planning and execution across crewed and uncrewed systems. The effort establishes a minimum viable capability roadmap by evaluating user needs, system architecture, data interoperability, and security requirements to inform future development and fielding strategies for PEO-Maritime and NSW stakeholders.
CPO 88NGCS ICD Load12/01/2025PEO Maritime, Undersea, seeks an update of the host to MMDS interface loads to permit evaluation of the interfacing structures (host ship structure, Host Interface Equipment, Host Ramp Fairing, and MMDS structure) based on recently completed loads analysis.
CPO 77DCS Transporter FEA10/23/2025Supporting USSOCOM PEO-Maritime Undersea, this project is to perform a Finite Element Analysis (FEA) on the DSC Transporter. The DCS Transporter is a program of record developed under CPO 45. In order to move the DCS Transporter on an U.S. Air Force aircraft, PEO-Maritime must obtain Air Transportability Test Loading Activity (ATTLA) certification
CPO 56MDCC Helios - RAVN10/22/2025Project will provide SOFWERX with a prototype software system that expedites operational communications capability across multiple command and control echelons. The product enables warfighters in the TOC/JOC (at any echelon) to subscribe to data bit message types derived directly from battlefield communications provided by operators equipped with the Hyper-enabled Awareness Kit (HEAK). These structured data messages can be pre-configured by special operators and TOC personnel to develop automated, TTP based, rule sets that would otherwise be manual in nature. Removing normal battle-rhythmic manual communications from the battlefield enables operators to further mitigate mission risk. This product should hyper-enable the force by connecting the tactical edge to the enterprise in a much more seamless way and providing the higher echelons of command with unprecedented visibility and awareness of battlefield conditions. This open messaging system will also be ready to power AI enabled platforms and UXS across the battlespace.
CPO 77Submerged Tow Phase IIIA10/06/2025The purpose of this project is to demonstrate a subsystem capable of towing the S351 submersible from a surface host while submerged. This demonstration provides two benefits; it verifies the capability of towing S351 in a submerged condition behind a surface vessel and provides a less complex and more cost-effective means of proving the capability of towing S351 from a submerged host.
CPO 77Prototype DPD Batteries Shipping09/30/2025This project is to cover the shipping costs to ship the PEO-M CD owned STIDDs battery to the vendor, PSI. This supports the project under CPO88.
CPO 77Rechargeable Battery Test Support08/15/2025From February 2023 to September 2024, SOFWERX (SWX) in collaboration with USSOCOM, PEO-M Combat Diving conducted three Phase II Small Business Innovative Research (SBIR) activities with three (3) vendors. These vendors delivered eight (8) rechargeable batteries each for use in fielded Patriot 3-Marine (P3M) JetBoot 50Ah battery cases. The purpose of this effort is to provide test support for the batteries delivered under the previously conducted SBIR activities under CPO61.
CPO 77Submerged Tow Phase IIIB07/08/2025The purpose of this project is to demonstrate a subsystem capable of towing the S351 submersible from a surface host while submerged. This demonstration provides two benefits; it verifies the capability of towing S351 in a submerged condition behind a surface vessel and provides a less complex and more cost-effective means of proving the capability of towing S351 from a submerged host.
CPO 77Inventus Phase II11/29/2024This effort will provide SOFWERX (SWX) and USSOCOM SOF AT&L PEO-Maritime (PEO-M) with the test articles suitable for propagation testing. Naval Surface Warfare Center – Crane Division (NSWC-CD) and Naval Undersea Warfare Center (NUWC) will provide technical and subject matter expertise thorough this effort.
CPO 77Wave Slap Analysis11/17/2024This work is to provide an analysis that will assess the impacts of changes to various loading conditions on the existing ASDS HCE design originally developed by Northrop Grumman Systems Corporation (NGSC).
CPO 45DCS Transporter03/15/2024USSOCOM seeks a rapid, versatile, and cost-effective transport mechanism for the DCS which can deliver the vessel over land, air, and sea. The original vessel design supported transportation within a 40-foot High Cube Military Van (MILVAN), on a Low Boy (low bed), or standard flatbed-type trailer. Several fact-of-life changes, including an increase in size and weight of the vehicle, along with associated airport offloading options have driven the need for a design-for-purpose transporter to meet the transportability requirements for all realistic operational scenarios.
CPO 66MANPAD Optic Mount02/13/2024Due to limited resources at current deployed location, MANPAD optic mounts must be manufactured and delivered to the end user. Use supplied STL file to additively manufacture MANPAD optic mounts. A total of 12 mounts are to be printed and carbon-fiber-reinforced.
CPO 45Inventus Power01/29/2024This effort will provide SOFWERX (SWX) and USSOCOM SOF AT&L PEO-Maritime (PEO-M) with the test articles suitable for propagation testing. Naval Surface Warfare Center – Crane Division (NSWC-CD) and Naval Undersea Warfare Center (NUWC) will provide technical and subject matter expertise thorough this effort.
CPO 45DCS Transporter Lift Pin Restraining Device10/18/2022During the design and manufacture of the PEO-M Transporter, the End User determined the need for an additional set of lift pin restraining devices for the vessel. This effort is to provide SOFWERX (SWX) and USSOCOM SOF AT&L PEO-Maritime (PEO-M) with two (2) Lift Pin Restraining Devices custom made for the S351.
CPO 45DCS Battery Pod Analysis06/23/2022This project will provide SOFWERX (SWX) and USSOCOM SOF AT&L PEO Maritime (PEO-M) with an analysis of the DCS Battery Pod Pressure Vessel mounting and clamping arrangement to evaluate their capability to sustain loads expected during airlift of the DCS submersible on the PEO-M Transporter.
CPO 45Removable Bow Planes06/21/2022This work is to provide SOFWERX (SWX) and USSOCOM SOF AT&L PEO Maritime (PEO-M) with three (3) removable bow plane kits and spares. These kits will be used on USSOCOM’s PEO-M. There will be a removable bow plane kits for each of the three (3) vessels.
CPO 36S351 Submerged Tow08/30/2021The S351 is a manned, battery-powered prototype swimmer lockout dry submersible developed by PEO Maritime of USSOCOM. The S351 is now owned and operated by Naval Special Warfare Command (WARCOM). Currently, the operational capability is limited by its battery life and personnel life support. This project will extend the submersible’s range and provide additional mission capability and flexibility. This project captures Phase II of a five-phase Government project. Phase I served as the baseline engineering development and design of the capture and release mechanism executed under a separate Government contract. Phase II will employ the capture and release mechanism developed in Phase I. This work is to provide SOFWERX with all labor, equipment, materials and facilities to procure, fabricate and pre-install test a towing subsystem for the S351 submersible. The designed and developed subsystem will support towing the submersible while submerged from a surface host.
CPO 36PEO-M Transporter10/02/2020PEO-M Transporter Assessment Event (AE)
CPO 38Rotinor 350002609/25/2020Evaluation of PEO-M furnished Rotinor for battery modification. The goal is to determine the possibility of transplanting NAVSEA certified batteries from a STIDDs battery pack into a Rotinor underwater scooter. Currently the Rotinor batteries are not NAVSEA certified and the vendor is unwilling to modify.
CPO 21Tow Behind Vehicle (TBV) Corrosion Effort 276874709/09/2019Corrosion prevention effort for a submersible ballast tank
CPO 21Trailer Brakes Corrosion Prevention 276900009/03/2019The objective of this project is to develop a low-cost solution that prevents, or significantly reduces the corrosion experienced in the braking system of the Mk I Trailer. This is a follow-on effort from the trailer brakes TeamWERX challenge.
CPO 13Submersible Personal Watercraft (PWC) 246913405/07/2019This effort will develop and deliver a proof of concept submersible personal watercraft (SPWC) capable of being stored at depth, surfaced, utilized for mission, returned to rendezvous point, submersed to depth, and redocked/stored for future missions.  SOFWERX is working with Innespace and C4 Group.
CPO 13JTAC VR Kit 244119812/14/2018JTAC training kit with VR goggles and hand joysticks, and a laptop for realistic, immersive training.
CPO 13NFMI Assessment II 244816409/05/2018Study to determine detectability and interceptablity of NFMI
CPO 13GPS Puck - Project Continuation 243622602/28/2018SOFWERX has engaged L-3 IEC division, Draper Labs and Kopis Mobile to design and develop a man-wearable SAASM GPS receiver with integrated antenna.
CPO 3Multi-Rotors: 3D Printing 235623602/13/2017NSW lacks the ability to conduct rapid prototyping of multi-rotor components through additive manufacturing processes that can be deployed in the field. Develop a scalable 100mm - 1000mm common, 3D printable design for Group 1 multi-rotor UAS that is compatible with COTS hardware such as motors, propellors, controllers, transmitters, receivers and other sensors. Emphasis on maximizing payload through optimized airframe design and modularity to simplify deployment and component replacement. An FDM printer should also be specified that will be simple to deploy and use in theater.
CPO 5Precision Engagement Carriage and Control Kit (PECCK) 238201011/18/2016NSWG4 identified an interst in acquiring an offensive/defensive strike capability within a common carriage interface. A mid-ship carriage kit was designed, modeled, and simulated for a Combatant Craft Medium. A preliminary design review was presented to SOCOM and NSW leadership for further guidance.

Assessment Events (8)

CPOTitleCompletion DateDescription
CPO 45Battery Charger AE-P03/26/2024
CPO 45DCS Fault Tolerant Battery Assessment Event03/26/2024This AE will be to identify possible DCS battery alternatives.
CPO 45Fault-Tolerant Battery Technology AE02/21/2023SOFWERX, in collaboration with USSOCOM Program Executive Office-Maritime Undersea (PEO-M), will host a series of events to identify solutions for submersible vehicle programs fault-tolerant battery technology. In June 2021, SOFWERX hosted a Virtual Collaboration Event (CE) to (1) promote specific areas of interest, (2) encourage an early exchange of information, and (3) provide an opportunity for both Government and Industry to gather more information prior to the release of a formal solicitation. With valuable information learned from that event, PEO-M is seeking proposals that define system level solutions for the Main Battery system for the PEO-M Program Office needs.
CPO 45Battery Charger AE01/11/2023SOFWERX, in collaboration with USSOCOM Program Executive Office-Maritime Undersea (PEO-M), will host an Assessment Event (AE) to identify solutions for the submersible vehicle programs Battery Charger.
CPO 49Unattended Maritime System (UMS) Optical Subsystem AE11/09/2021Develop an optical subsystem prototype for use on a specific UMS.
CPO 52PEO-M Weight Reduction Virtual AE, 1227005308/05/2021SOFWERX, in concert with USSOCOM PEO-Maritime (PEO-M), will host a Virtual Assessment Event (AE) to identify techniques and technologies to reduce the dry and wet weight of the PEO-M submersible vehicle.
CPO 36PEO-M Transporter AE09/04/2020SOFWERX, in concert with USSOCOM PEO-Maritime (M), will host a series of events to identify solutions to PEO-M Transportation.
CPO 45DCS Weight Reduction Assessment EventThis AE will be to identify techniques and technologies to reduce the dry and wet weight of the DCS Vessel.

Collaboration Events (5)

CPOTitleCompletion DateDescription
CPO 81PEO-M Next Gen Maritime Optical Systems CE06/10/2025SOFWERX, in collaboration with USSOCOM Program Executive Office - Maritime (PEO-M), will host a series of events to identify solutions for the Next Generation Maritime Optical Systems for the Naval Special Warfare Combatant Crafts.
CPO 30PEO-M Transporter CE 529639106/10/2020SOFWERX, in concert with USSOCOM PEO-Maritime (M), will host a series of events to identify solutions for PEO-M submersible vehicle Transportation.
CPO 21PEO-M CCH Mk2 CCE 276816603/28/2019On 27 – 28 March, SOFWERX, in collaboration with USSOCOM PEO-Maritime and PM-Surface Systems, hosted a Capability Collaboration Event focused on assessing the current state-of-the-art, industrial capability to design a new craft, or modify an existing design, to meet the requirements for the Combatant Craft Heavy Mark 2 (CCH Mk 2). Participants were given an opportunity to collaborate with Government, Industry, Academic, and Laboratory partners to further understand the needs of PEO-Maritime and PM-Surface Systems. 62 representatives from Government and Academia attended. Participants engaged in direct dialogue with Warfighters and Government subject matter experts related to four technology problem statements: craft designs, power generation and management, payload launch and recovery and handling/stowage, C6ISR.
CPO 12Submersible Personal Watercraft (PWC) 242176212/13/2017On 13 December 2017, SOFWERX, in collaboration with USSOCOM, hosted the Submersible Personal Watercarft Capability Collaboration Event (CCE) to discuss new, novel, and provocative possibilities with current subject matter experts (SME) in industry, academia, and government laboratories. Over 30 attendees were briefed by Naval Special Warfare personnel . Subsequently, the attendees discussed the technical challenges associated with the development of a prototype and the appropriate objectives for a proof of concept PWC. An outline of technical challenges associated with a submersible PWC was developed. A refined definition of the objectives for a submersible PWC prototype was addressed and examined. The event allowed collaboration and partnerships between participating government, industry, academia, and lab representatives. A project guideline was developed. 10 groups submitted proposals for review by SOFWERX and government personnel.
CPO 38PEO-M Fault Tolerant Battery Technology CESOFWERX, in concert with USSOCOM PEO-Maritime Undersea (PEO-M), will host a series of events to identify solutions to the PEO-M fault-tolerant battery technology.

Expos (1)

CPOTitleCompletion DateDescription
CPO 66Performance Monitoring Wearables Industry Demonstration DaySOFWERX, in collaboration with the Navy Special Warfare Center (NSWCEN), will host an Industry Day to allow potential vendors to demonstrate physiological monitoring capabilities. These engagements with Industry and Government Labs will help NSWCEN identify potential material solutions. NSWCEN intends to survey industry for mature, non-developmental, technology that may support rapid fielding of this capability.

Prize Challenges (2)

CPOTitleCompletion DateDescription
CPO 21TeamWERX: Trailer Brakes 276886001/31/2019The objective of this TeamWERX effort is to develop a low-cost solution that will prevent or significantly reduce the corrosion of the CCH Mk I trailer brake components. The solution should significantly reduce corrosion, allow for the complete operation of the failing parts listed below, and consequently allow for the complete operation of the entire brake system. Submissions for entire brake systems that address this problem may also be considered. NOTE: The solution must abide by Department of Transportation (DOT) standards.
CPO 13TeamWERX: Special Operations Boat Seat (#18) 247476401/15/2018Challenge Requirements: Build a small underwater robot that looks like a marine organism. The robot should- to the degree feasible- use natural appearing propulsion mechanism. • The robot should be capable of traveling 200 meters without a recharge.

CPO (4)

CPOTitleCompletion DateDescription
CPO 45Portfolio03/26/2024This CPO provides an acquisition framework and funds to the USSOCOM PIA H92222-15-3-0001 to facilitate the necessary technical and subject matter expert (SME) support to survey and acquire commercial items for user assessment, enable event/project-based prototyping, concept exploration and divergent and innovative collaboration for USSOCOM emerging challenges. Objectives are to create a tailored Rapid Innovation Project Series (RIPS), especially involving diverse system integration investigations, that supports emerging PEO Maritime (PEO-M) technical challenges through collaborative events and user assessments, combat evaluation, rapid integration, prize challenges and prototyping.
CPO 36Portfolio08/30/2021The objective of the Rapid Innovation Prototyping Series (RIPS) is to support emerging USSOCOM SOF AT&L Program Executive Office Maritime (PEO M) technical challenges through collaborative events, prize challenges, and prototyping.
CPO 21Portfolio PEO-Maritime RIPS 276832809/03/2019The objective of the Rapid Innovation Prototyping Series (RIPS) is to support emerging Program Executive Office Maritime (PEO-M) technical challenges through collaborative events, prize challenges and prototyping.
CPO 3Portfolio DWX 259635409/14/2016The objective of DWX is to create a rapid prototyping/proof of concept facility in the vicinity of SOFWERX in Ybor City, to be utilized by the Doolittle eco-system, selected partners and event participants for the benefit of USSOCOM

N/A (1)

CPOTitleCompletion DateDescription
CPO 5Precision Engagement Carriage and Control Kit (PECCK) TT1130491711/18/2016NSWG4 identified an interst in acquiring an offensive/defensive strike capability within a common carriage interface. A mid-ship carriage kit was designed, modeled, and simulated for a Combatant Craft Medium. A preliminary design review was presented to SOCOM and NSW leadership for further guidance.

Total Count: 51